A summary of performance for Discussion 04. This module focused on identifying risks in Project 01 and applying the TAME framework from Chapter 4 of the course text.

Class Average

16.8

Strong Pass

Perfect Scores

15

20/20 Achievement

Participation

46

Students Engaged

Pass Rate

96%

Active Cohort

The Risk Calculation

Actual Risk = I × P

Impact (1-5)

How much does this hurt the project?

Probability (1-5)

How likely is it to happen?

Note: A score of 12 or above requires an active strategy. Scores of 1-11 are typically "monitored" or "accepted."

T.A.M.E Strategies

Transfer

Pass the risk to someone else (e.g. Insurance).

Accept

Live with it if the cost of fixing it is too high.

Mitigate

Reduce the Impact or Probability (e.g. Backups).

Eliminate

Change the project so the risk doesn't exist.

Grade Distribution

Scores were categorized into four tiers based on technical accuracy and engagement.

The "Citation Gap"

Analyzing why 17 was the most common score this week.

20/20

Wall of Fame: Perfect Scores

Christian
Aaliyah
Kaylee
William
Aryan
Zerrie
Carlos
Barbara
Shawn
Miguel
Xavier
Marisol
Rick
Stephanie
Tyler

Final Results Summary

The cohort demonstrated high professional maturity in identifying environmental risks (weather, outages) alongside technical risks (CSS selectors, malformed tags).

Most of you correctly applied the numerical threshold (12+) to trigger a TAME strategy. This demonstrates that you are beginning to think like "Unofficial Project Managers" who quantify their obstacles before attempting to solve them.

📚

Technical Requirement

APA CITATION REMINDER

The primary cause for point deductions this week was missing the mandatory APA style citation for the textbook.

Kogon, K., & Blakemore, S. (2024). Project management for the unofficial project manager (Updated and revised ed.). BenBella Books.